Archive

YVR Jet Fuel Marine Offloading, Storage and Distribution Terminal

FSM Group has been leading the long-term planning and development of fuel supply infrastructure for the Vancouver International Airport since 2005. With continued airport growth, and declines in local fuel supply, the need has arisen to develop new delivery infrastructure beyond the airport’s boundaries. FSM Group is managing… Read More

YYZ Jet Fuel Hydrant System Expansion

Over a period of several years, the Greater Toronto Airports Authority undertook an extensive Passenger Terminal Development Program to meet traffic demand forecasts and required facility infrastructure and capacity requirements beyond 2030. Work at the Toronto Pearson International Airport included the demolition of Terminal 2 and… Read More

YYZ Environmental Site Assessment and Soil Remediation

On this $350,000 project, an environmental site assessment and soil remediation was undertaken to determine if soil was contaminated at the airport. An excavation of soil that was suspect or known to be contaminated was stockpiled separately from clean soil. All soils were tested and managed within applicable regulatory criteria. Read More

YUL Soil and Groundwater Remediation

A soil and groundwater remediation project consisting of the installation of an in-situ treatment system, containment trench and groundwater pumping system was undertaken at the Montréal-Pierre Elliott Trudeau International Airport. The advantage of the in-situ treatment was that it allowed for soil to be treated at the… Read More

YHZ Hydrant System Relocation

The Halifax International Airport Authority (HIAA) embarked on a $400 million multi-year Airport Improvement Program (AIP) to keep pace with growing demand at Halifax Stanfield International Airport (YHZ). Growth in passenger traffic required an expansion of the terminal building, which involved a northward extension and a… Read More