The Winnipeg Airports Authority (WAA) constructed a new terminal building with 12 refuelling gates adjacent to the existing terminal, allowing for current and future expansion at the Winnipeg James Armstrong Richardson International Airport. The greenfield site allowed for the opportunity to construct a $5 million… Read More
A $40 million expansion of the jet fuel storage facility was undertaken at the Vancouver International Airport to increase fuel storage from 12 million to 52 million litres to keep pace with growing demand. The two-year project consisted of the construction of four aboveground steel tanks surrounded by… Read More
As part of a 20-Year Master Plan, the Vancouver Airport Authority undertook an expansion of the domestic terminal facilities at Vancouver International Airport. The expanded domestic terminal is supplied with fuel through a new underground pipeline and hydrant system that is connected to the existing… Read More
For the past several years, the Toronto Pearson International Airport has experienced continued airport growth and shortages of jet fuel supply from existing delivery methods, resulting in a need to develop new delivery infrastructure outside of the airport’s boundaries. This multi-million project included the construction of a rail… Read More
The jet fuel storage facilities at the Ottawa Macdonald-Cartier International Airport were expanded from two to four million litres to keep pace with growing demand and to improve on-airport fuel reserves. The $3.2 million project consisted of the construction of two jet fuel storage tanks that increased reserve… Read More
As part of the Aéroports de Montréal Terminal Development Program, a $1.8 billion five-year project was undertaken at the Montréal-Pierre Elliott Trudeau International Airport that included the refurbishment of the Domestic Terminal, the partial demolition of the Aéroquai Terminal, and a modification of the hydrant fuelling… Read More