A soil and groundwater remediation project consisting of the installation of an in-situ treatment system, containment trench and groundwater pumping system was undertaken at the Montréal-Pierre Elliott Trudeau International Airport. The advantage of the in-situ treatment was that it allowed for soil to be treated at the site without being transported.